The construction of the main airport is complete
Work at the new terminal at Lumberton Regional Airport is almost finished. The $3.7 million terminal will be more than twice the length of the previous terminal and will provide a lot of amenities for pilots and visitors.
Jonathan Bym the Robesonian
An aviation-themed mural adorns the wall of the terminal lobby under the structure of Lumberton Regional Airport. The symbol is a map of the local domain and a representation of the airport runway.
Jonathan Bym the Robesonian
An aviation-themed mural adorns the wall of the terminal lobby under the structure of Lumberton Regional Airport. The symbol is a map of the local domain and a representation of the airport runway.
Jonathan Bym the Robesonian